- ConstructionOnline Knowledge Base
- Manage Account
- Company Cost Codes
-
Getting Started
-
FAQs
-
Workflows
-
Manage Account
-
Manage Company Users
-
Contacts
-
Lead Tracking
-
Opportunities
-
Projects
-
Estimating
-
Change Orders
-
Client Selections
-
Purchasing
-
Invoicing
-
Items Database & Costbooks
-
Accounting Integrations
-
Scheduling
-
Calendars
-
To Do Lists
-
Punch Lists
-
Checklists
-
Daily Logs
-
GamePlan™
-
Time Tracking
-
Communication
-
RFIs
-
Submittals
-
Transmittals
-
Redline™ Takeoff
-
Redline™ Planroom
-
Files & Photos
-
Company Reporting
-
CO™ Drive
-
Using the ClientLink™ Portal
-
Using the TeamLink™ Portal
-
SuiteLink
-
CO™ Mobile App
-
ConstructionOnline API
Import a Cost Code List
OBJECTIVE
To import a Cost Code List into ConstructionOnline
BACKGROUND
ConstructionOnline's Cost Code system ties numerous features together based on the type of work being completed. It boosts visibility for each division cost and allows you to stay organized and informed throughout the construction process.
THINGS TO CONSIDER
- A Cost Code List is required in order to use Cost Codes in a project.
- Imported Cost Code Lists must precisely follow the format provided.
- Any Cost Code List can be exported from ConstructionOnline in the same import format.
- There are 4 Cost Code Import Templates: 2, 3, 4, and 5-Level.
STEPS TO IMPORT A COST CODE LIST
- Navigate to the Company Dropdown Menu at the top right corner of the page
- Select Company Cost Codes
- This will open the Cost Codes page
- Click the green +Add New button
- This will open the Add New Cost Code List window
- Select Import Cost Codes
-
- This will open the Import Cost Codes window
-
- Download the Excel Template that best matches your Cost Code List based on division levels, from 2 to 5 Levels
- Follow the instructions to enter your information in the Template and save it
- Exit Excel and return to ConstructionOnline
- Choose the Excel File and enter a Name
- Click Import
TIPS AND TRICKS
When/If your imported Cost Code List needs to be changed, you can edit the list directly in ConstructionOnline.
HAVE MORE QUESTIONS?
- Frequently asked questions (FAQ) about Company Cost Codes can be found in the article FAQ: Company Cost Codes.
- If you need additional assistance, chat with a Specialist by clicking the orange Chat icon located in the bottom left corner or visit the UDA Support Page for additional options.