Skip to content
  • There are no suggestions because the search field is empty.

Update Multiple Change Order Items

Bulk update several change order items for a project in your ConstructionOnline company account

put https://api.constructiononline.com/api/ChangeOrderItems?coItemInfo={coItemInfo}

This endpoint allows users to edit multiple change order items within a project at once. To bulk update change order items, users must know the unique numerical ID assigned to each item. The change order item's ID is stored in the property 'ID'. Users should enter the properties to be updated in the URL of the request—specifically, in the "coItemInfo" request parameter. Only the properties specified in the parameter will be updated; the other properties will remain as is. 

To update multiple items, users must create a JArray where each item is a comma-seperated JSON object. The item's updated properties should be entered as key-value pairs. This JArray should be entered in the coItemInfo request parameter.

[
        {
      "ID": "101",
      "NAME": "Item 1",
      "NUMBER": "1",
      "PRICE": "5280"
        }
        ,

        {
      "ID": "102",
      "NAME": "beta",
      "NUMBER": "2",
      "PRICE": "525600"
        }

]
        

Requests


coItemInfo: JSON 

  • Updated properties for each change order item.
  • Allowed properties in coItemInfo: NAME, DESCRIPTION, LINE_ITEM_MARKUP, RATE, RATE_QTY, LINE_ITEM_MARKUP_TYPE, ADJUSTMENT, COST_CODE_ID, DOLLAR_MARKUP, INVOICED_AMOUNTS, ACTUAL, QB_INVOICED, QB_ACTUAL, TAX_PERCENT, SALES_TAX, COST_ESTIMATE, SUBCATIDS

Example requests in cURL, C#, Python, and JavaScript can be found below:

cURL

# replace {email} with the email address for your ConstructionOnline account
# {password} with your ConstructionOnline password
# {apikey} with your provided API key
# {coItemInfo} with the items and their updated properties


curl -X PUT https://api.constructiononline.com/api/ChangeOrderItems?coItemInfo={coItemInfo} -u {email}:{password} -H 'APIKey:{apikey}'

C#

/* replace {username} with the email address for your ConstructionOnline account
           {password} with your ConstructionOnline password
         {apikey} with your provided API key
          {coItemInfo} with the items and their updated properties */

public string MakeRequest(string endpoint, string payload) {
                string username = {username};
                string password = {password};
                string apiKey = {apikey};
                string response = "";
                var handler = new HttpClientHandler() { AutomaticDecompression = System.Net.DecompressionMethods.GZip };
                using (HttpClient client = new HttpClient(handler)) {
                    client.BaseAddress = new Uri("http://api.constructiononline.com");
                    client.DefaultRequestHeaders.Accept.Clear();
                    client.DefaultRequestHeaders.Accept.Add(new MediaTypeWithQualityHeaderValue("application/json"));
                    client.DefaultRequestHeaders.Authorization = new AuthenticationHeaderValue("Basic", System.Convert.ToBase64String(System.Text.Encoding.GetEncoding("ISO-8859-1").GetBytes(username + ":" + password)));
                    client.DefaultRequestHeaders.Add("APIKey", apiKey);
                    client.DefaultRequestHeaders.Add("Accept-Encoding", "gzip");
                    HttpContent content = new StringContent(payload, System.Text.Encoding.UTF32, "application/json");
                    response = client.PutAsync(endpoint, content).Result.ToString();
                }
                return response;
            }
   MakeRequest("api/ChangeOrderItems?coItemInfo={coItemInfo}");

Python

#replace {username} with the email address for your ConstructionOnline account
#{password} with your ConstructionOnline password
#{apikey} with your provided API key
#{coItemInfo} with the items and their updated properties

import base64, requests, json

   #Global Variables
    apikey = {apikey}
    username = {username}
    password = {password}

    #Functions
     def makeRequest(endpoint, payload):
           url = "https://api.constructiononline.com/" + endpoint
            userPass = username + ":" + password    
            headers = {
                    "APIKey": apikey,
                    "Accept-Encoding": "gzip, deflate, br",
                    "Authorization": "Basic " + base64.b64encode(userPass.encode()).decode(),
                }
                response = requests.request("PUT", url, headers=headers, data=payload)
                return json.dumps(json.loads(response.text), indent=2)   
  #Main Program
print(makeRequest("api/ChangeOrderItems?coItemInfo={coItemInfo}"))

JavaScript

/* replace {username} with the email address for your ConstructionOnline account
           {password} with your ConstructionOnline password
         {apikey} with your provided API key
          {coItemInfo} with the items and their updated properties */

 username = '{username}';
password = '{password}';
apikey = '{apikey}';
 
function makeRequest(endpoint, payload) {
           auth = btoa('${username}:${password}');
           var myHeaders = new Headers();
           myHeaders.append("APIKey", apikey);
           myHeaders.append("Accept-Encoding", "gzip, deflate, br");
           myHeaders.append("Authorization", "Basic ${auth}");
              var requestOptions = {
                    method: 'PUT',
                    body: '',
                    headers: myHeaders,
                    redirect: 'follow'
                };
                fetch("https://api.constructiononline.com/" + endpoint, requestOptions)
                    .then(response => response.text())
                    .then(result => console.log(result))
                    .catch(error => console.log('error', error));
                return response;
            };

makeRequest("api/ChangeOrderItems?coItemInfo={coItemInfo}");

Responses

green 200: Success

A successful request will return a 200 response with a record of the edited change order items in the body.

A sample response and property definitions can be found here. 

red 404: Error

The server was not able to locate the resource specified in the request. The ID may have been entered incorrectly or a change order item with the entered ID does not exist.

red 429: Error

The user has surpassed the request rate limit for the hour, day, week, or month.

 red 500: Error

There was an internal server error and the server was unable to complete the request.

 

Last updated: April 19, 2024