How do I link a Schedule Task to a To Do?
With SmartLink—ConstructionOnline's innovative technology engineered to further integrate all of the moving parts of construction project management—Company and/or Project To Dos can be linked to OnPlan™ Schedule Groups or Tasks through the "Linked Items" tab within a To Do or Schedule Task's Details.
To link items from a Schedule Task, follow the steps below.
- Navigate to the desired Project via the Left Sidebar.
- Select the Calendars & Schedules tab, then select the Scheduling category.
- Locate the specific Schedule Task.
- OPTION 1: Drag and Drop To Do
- Select the "Show Linked Items" button.
- Locate the specific To Do, then drag and drop it onto the specific Schedule Task.
- OPTION 2: Edit Schedule Task Details
- Right-click on the Schedule Task, then select the "Edit Task" option.
- Then, select the "Linked Items" tab within the Task Details window.
- Click the green (+) Link To Do button. It will ask you if you want to link an existing To Do, or create a new To Do.
- If you select "Add New To Do":
- Fill out the details for the new To Do, then select the blue "Save" button.
- If you select "Link Existing To Do":
- Locate the To Do you want to link the Task to, then click its link icon
. - Continue selecting any additional To Dos you want to link to the Task, then select the blue "Save" button.
- Locate the To Do you want to link the Task to, then click its link icon
- If you select "Add New To Do":
- Click the secondary blue "Save" button to finalize your new changes.