What is the difference between a Lump Sum and Detailed Change Order?
A Lump Sum Change Order is represented by one single line, or cost. Lump Sum Change Orders are most commonly used when the cost of the change order can be defined as an exact amount. Detailed Change Orders break down the cost of a change order into itemized lines with their own individual tax & markup methods. Each line may be associated with a different cost, such as materials, labor, or additional fees.